Skip to content

fix: Populate destination name when destination server is specified #35684

fix: Populate destination name when destination server is specified

fix: Populate destination name when destination server is specified #35684

Triggered via pull request December 4, 2024 21:18
Status Cancelled
Total duration 10m 35s
Artifacts

ci-build.yaml

on: pull_request
Build & cache Go code
3m 8s
Build & cache Go code
Build, test & lint UI code
1m 33s
Build, test & lint UI code
Ensure Go modules synchronicity
15s
Ensure Go modules synchronicity
Lint Go code
3m 45s
Lint Go code
Check changes to generated code
4m 30s
Check changes to generated code
Matrix: Run end-to-end tests
Run unit tests for Go packages
5m 3s
Run unit tests for Go packages
Run unit tests with -race for Go packages
6m 37s
Run unit tests with -race for Go packages
E2E Tests - Composite result
0s
E2E Tests - Composite result
Process & analyze test artifacts
0s
Process & analyze test artifacts
Fit to window
Zoom out
Zoom in

Annotations

14 errors and 1 warning
Lint Go code: util/argo/argo.go#L515
non-wrapping format verb for fmt.Errorf. Use `%w` to format errors (errorlint)
Lint Go code
issues found
Run unit tests for Go packages
Process completed with exit code 2.
Run unit tests with -race for Go packages
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/21063/merge' exists
Run unit tests with -race for Go packages
The operation was canceled.
Run end-to-end tests (v1.31.0, true)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/21063/merge' exists
Run end-to-end tests (v1.31.0, true)
The operation was canceled.
Run end-to-end tests (v1.28.13, false)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/21063/merge' exists
Run end-to-end tests (v1.28.13, false)
The operation was canceled.
Run end-to-end tests (v1.29.8, false)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/21063/merge' exists
Run end-to-end tests (v1.29.8, false)
The operation was canceled.
Run end-to-end tests (v1.30.4, false)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/21063/merge' exists
Run end-to-end tests (v1.30.4, false)
The operation was canceled.
E2E Tests - Composite result
Process completed with exit code 1.
changes
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636